GEUKDONG Engineering, the leader of building Korea.
Aims to facilitate the development of National inddustriy and Construction of prosperous society
through construction of prompt and comfortable railway infrastructure
Pre-Feasibility Study Service
Selection of Alternative alignment, and estimation of Project costs per options / Development Plan Analysis for Station influenced area, and future development / Project Economic Feasibility Review
Master Plan Service
Alignment Plan, and Estimation of Investment Scale per Options and Costs / Plan for Railway Infrastructure Construction & E&M / Total Project Cost Estimate / Economic Feasibility Review / Initial Environmental Assessment / Pre-Disaster Impact Assessment
Preliminary Design Service
Establishment of Design standards / Selection of the most optimal alignment / Engineering Survey and Geotechnical Investigation / Pre-Disaster Impact Assessment / Preliminary Design for Earthwork, Bridge, Tunnel and trackbed
Detailed Engineering Design Service
Detailed Engineering Survey and Land Survey / Surface Geological Survey, and Geotechnical Investigation / Detailed Engineering Design for Earthwork, Bridge, Tunnel, and Trackbed
The department of Railways is implementing all range of services such as Surveys, Master Plan, Preliminary & Detailed Engineering Design, and Construction Supervision and Management for Urban subway, Metro, LRT, MRT, HSR and etc. with competitive technical team and accumulated technical competence. In addition, we are rendering our best in environment-friendly railway infrastructure research, and r&d for Railway speed improvement technology that will lead the future national railrway industry. The department of Railways will endeavor to contribute to the construction of a prosperous society such as the development of the national industry and the improvement of the people's living environment through rapid and comfortable railway construction.